Skip to content

PLANNING SUN

Business

Vacuum Blood Collection Tube Manufacturing Turnkey Project

Vacuum Blood Collection Tube Manufacturing Turnkey Project

TURNKEY PROJECT

Vacuum Blood Collection Tube Manufacturing Turnkey Project

VACUUM BLOOD COLLECTION MANUFACTURING TURNKEY

PROJECT OVERVIEW

Start your manufacturing business with Planning Sun automation.

Based on Planning Sun’s accumulated vacuum blood collection tube automation equipment and process-module technologies,
review your business direction and required process scope.
Turnkey project consultation is available
for entering the vacuum blood collection tube manufacturing business.
Vacuum blood collection tube turnkey project equipment
PROJECT GOALEntry into vacuum blood collection tube manufacturing
CORE SCOPEReview of manufacturing process and automation configuration
CONSULTATIONDiscussion of requirements and project direction

INTEGRATED PROJECT SCOPE

We review core equipment and process modules
as one production flow.

Vacuum Blood Collection Tube Assembly Machine

Vacuum Blood Collection Tube Assembly Machine

NON-STOP ONE LINE configuration from tube supply to labeling and packaging

Vacuum Blood Collection Tube Cap Assembly Machine

Vacuum Blood Collection Tube Cap Assembly Machine

System connecting plastic/rubber cap supply, assembly, inspection, and defective product discharge

Tube Sorting Module

Tube Sorting Module

Supplies bulk PET tubes in an aligned state

Gel Filling Module

Gel Filling Module

Fixed-amount filling through metering valve and gel dispenser

Microliter Spray Module

Microliter Spray Module

Inner tube wall coating by microliter control and mist spraying

PROJECT PROCESS

5-Step Project Process

Consultation starts by confirming the business direction and required process scope.
  1. 01Confirm Business Direction and Production Items

    Confirm the goals of the vacuum blood collection tube manufacturing business and target production items.

  2. 02Discuss Target Processes and Requirements

    Organize required automation processes, production methods, and site conditions together.

  3. 03Review Equipment and Module Configuration

    Review the application scope of automatic assembly equipment and tube sorting, gel filling, and Microliter Spray Modules.

  4. 04Discuss Line Layout and Project Scope

    Discuss the overall project scope based on process connections and equipment layout.

  5. 05Consult on Build Direction and Details

    Discuss schedule and detailed direction based on the review.

CONSULTATION BRIEF

What to check first
for consultation.

If you prepare the information below,
we can review the project scope more specifically.
PRODUCTION TARGET

Target production items and product configuration

PROCESS SCOPE

Required automation processes and module scope

SITE CONDITION

Installation space and equipment layout conditions

PROJECT PRIORITY

Priority review items and schedule

TURNKEY PROJECT INQUIRY

Start with project consultation as the first step toward manufacturing business entry.

We confirm production targets and required process scope to define the project direction.
Turnkey Project Inquiry